Reservoir in Kirchdorf
Kirchdorf in Tirol
favorite_borderfavoriteInformation
The farm "Talschmiede" used to be located where today the reservoir is located in Kirchdorf. When in the years 1901/1902 the project Staumauer on the Luigam was implemented, this farm had to give way. A 10-meter-high wall was erected for power generation and laid with pressure pipes of 354 meters. Since 1954, the power plant has been maintained and operated by TIWAG. Proof of literature: Dorfbuch Kirchdorf in Tirol
Read more
Opening hours and contact
Contact
, 6382 Kirchdorf in Tirol
Plan route